Progetti

Ordina i risultati per
Stato    

Oggetto 13 – 24 di 68

Small Irrigation Programme (SIP)

01.01.2020 - 31.12.2024

Swiss engagement through this project assists farmers in doubling their agricultural income through year-round irrigation and better access to markets. Doubling of agriculture income will contribute to poverty reduction and reduce poor farmer’s need to migrate. In addition, Swiss pioneering work in operationalizing federalism, through this project at local level will address issues related to historic over-centralization and social exclusion and will contribute to peace and stability in the country.


Trail Bridge Sub-Sector Program

01.12.2019 - 30.11.2023

The project supports the Government of Nepal to institutionalize trail bridge building under the new federal structure. Due to the ongoing state restructuring process, Swiss support is required for a last phase to ensure the transfer of the institutional and human capacity built-up in trail bridges over the past four decades to the new state and local governments. Walking remains a major mode of travel in Nepal, and trail bridges are still essential for people to access basic public services


Support to Dealing with the past roadmap implementation in Nepal

01.06.2019 - 31.03.2025


The program aims to support a new inclusive and equitable mechanism of dealing with the past with the purpose to address the root causes of the conflict which remains an uncompleted process in Nepal. The implementation of a comprehensive national roadmap will guaranty to be victim-centred and a government-driven process. This program provides a solid basis for strengthening an inclusive federal state


Provincial and Local Governance Support Program (PLGSP)

01.04.2019 - 15.07.2023

Nepal’s new federal constitution addresses the long-standing root causes of conflict related to poverty, gender inequality and social exclusion. The Provincial and Local Governance Support Program is the government’s nationwide framework capacity building initiative to enable the newly elected provincial and local governments to assume their constitutional rights and duties. Switzerland led the planning for the development partners, The program will strengthen subnational institutions and service delivery, and contribute to peace and stability.


She Leads – Women Leadership Programme

01.01.2019 - 31.12.2022

Federalism has created a historic opportunity for some 14’000 Nepalese women, over half of them from socially discriminated groups, to serve for the first time as elected representatives at local level. However, most elected women at local level remain excluded from political decision making due to discrimination based on patriarchal norms and values, and lack of resources and networks. The project promotes women leadership to support the peace process and to prevent future conflicts.


State Support Programme (SSP) Nepal

01.10.2018 - 31.01.2024

Switzerland contributes to peace and stability in Nepal by supporting the country’s successful transition to federalism which is a pre-condition for enhanced economic development and prosperity. States are a critical catalyst for identity, conflict resolution and regional development in Nepal’s federal system. The programme therefore supports the State’s systems and capacities for inter-governmental cooperation, implementation and responsiveness towards citizens’ demands.


Migrant Rights and Decent Work (MiriDew)

01.09.2018 - 31.12.2022

Remittances sent home by over 3 million Nepali migrant workers have significantly reduced poverty. Nevertheless, the rights of migrants are regularly violated. The proposed project will enhance the Government of Nepal’s understanding of overseas labour market conditions and strengthen mechanisms to better protect the rights of Nepali workers at home and abroad through better consular support and a strong presence in the international policy dialogue.


Safer Migration (SaMI III) project

16.07.2018 - 15.07.2024

Labour migration is positively affecting Nepal’s socio-economic development with remittances significantly reducing poverty. Nevertheless, the rights of migrants are often violated. The Safer Migration project will empower migrants and their families and strengthen government protection mechanisms. The project will benefit about 600’000 men and women in three states of Nepal and enable about 60 local governments to run foreign employment services.


Progetto concluso

Motorable Local Roads Bridge Programme (MLRBP) – Phase III

01.03.2017 - 31.12.2020

MLRBP III will contribute directly to improved livelihoods of 1.2 million rural people through technical assistance in bridge building and facilitating improved access. Lack of access to services, markets and opportunities remains one of the reasons for high poverty. Bridges on local roads are critical for an all year round access for the rural poor, creating economic and social development opportunities for them, and reducing the huge economic costs they incur for travel, trade, health and farm inputs.



Progetto concluso

Local Roads Improvement Programme (LRIP – II)

16.07.2016 - 31.12.2021

Past SDC interventions have focussed on making rural road construction work for the poor and disadvantaged through labour-intensive construction methods. This project now takes proven approaches further by ensuring even more all-weather accessibility to markets and services by emphasising the importance of maintenance and preservation of built roads through promotion of labour-based roads maintenance methods and by fostering an institutional process in the districts, which should pave the way for the highly successful concepts of road construction and maintenance to be adopted as national standards.
 


Progetto concluso

Motorable Local Roads Bridge Programme (MLRBP) – Phase II

01.06.2016 - 28.02.2018

Lack of access to services, markets and opportunities is one of the reasons for high incidence of poverty in Nepal. The Government of Nepal (GoN) has accorded a high priority to the construction of bridges to improve accessibility of remote areas in Nepal and increased the budget 5-fold in the last four years. The proposed phase will build on GoN’s confidence in the Swiss technical support, while preparing to accelerate the construction of bridges to facilitate improved access.

Oggetto 13 – 24 di 68