Armenia SET Floods June 2024
Due to heavy rainfall since 25./26.05.2024, severe flooding occurred in two regions of Armenia, which caused some casualties and serious damage to infrastructural facilities such as bridges, roads, railroad lines, pump stations etc. The Armenian authorities asked for international support and accepted Switzerland’s offer for assistance through the deployment of a “SofortEinsatzTeam / SET”, specialized in carrying out structural assessments of damaged infrastructure. Decisions on optimum use of funds will be taken by the Crisis Cell chaired by the Head of HA in close coordination with the desk and Swiss representation in the country.
Pays/région | Thème | Période | Budget |
---|---|---|---|
Arménie |
Aide humanitaire & RRC
Efficacité humanitaire
|
03.06.2024
- 30.06.2024 |
CHF 100’000
|
- Le Corps suisse d’aide humanitaire
-
Secteur selon catégorisation du Comité d'aide au développement de l'OCDE INTERVENTION D'URGENCE
Sous-Secteur selon catégorisation du Comité d'aide au développement de l'OCDE Coordination des secours et services de soutien et de protection
Type d'aide Mise en œuvre directe par la DDC
Numéro de projet 7F11421
Contexte | Two regions in Armenia (Lori and Tavush), which were mainly affected by the flooding |
Objectifs | The Armenian authorities in charge of the disaster response are supported in coping with the consequences of the flooding |
Groupes cibles |
Directly: Armenian authorities / National Agency of Emergency Management (NEMA), namely the Ministry of Territorial Administration and Infrastructure Indirectly: Population in Armenia affected by the flooding, having lost or at risk of losing livelihood or infrastructure and lives |
Effets à moyen terme | Contribution to the response activities of the Armenian authorities in charge, through engineering expertise to evaluate the infrastructure damaged by the flooding, such as brigdes, roads, railroad lines, pump stations etc. |
Résultats |
Principaux résultats attendus: Assessment missions in the affected regions and evaluation of damaged infrastructre as well as definition of possible action lines for the recovery phase |
Direction/office fédéral responsable |
DDC |
Partenaire de projet |
Partenaire contractuel |
Budget | Phase en cours Budget de la Suisse CHF 100’000 Budget suisse déjà attribué CHF 17’538 Projet total depuis la première phase Budget de la Suisse CHF 0 Budget y compris partenaires de projet CHF 500’000 |
Phases du projet |
Phase
2
08.07.2024
- 31.12.2025
(Phase en cours)
Phase 1 03.06.2024 - 30.06.2024 (Active) |