The intervention seeks to improve the national emergency response capacities of Mongolia in the area of Urban Search And Rescue (USAR). In Mongolia USAR services are delivered by the National Emergency Management Agency (NEMA). Capacity-building will be pursued through a selection of measures with special focus on the provision of simple training facilities, targeted training in USAR techniques as well as support for organizational and operational conceptualization.
Улс / бүс нутаг | Сэдэв | Хугацаа | Төсөв |
---|---|---|---|
Монгол улс |
Байгаль орчин
Disaster risk reduction DRR
|
01.01.2019
- 31.12.2019 |
шв.франк 210’000
|
- Establishment of several NEMA working groups for project implementation
- Identification, recruitement and employment of 12 new USAR trainers
- Planning and tendering of a new Modular Training Ground (MTG) for practical USAR trainings
- Evaluation and purchase of new rescue tools
- Conceptualization related to the upgrade process “SAR to USAR”
- Introduction of necessary adaptations in Management and Logistics
- National State Institute North
-
ЭЗХАБ-ын Хөгжлийн тусламжийн хороо DISASTER PREVENTION AND PREPAREDNESS
Sub-Sector according to the OECD Developement Assistance Commitiee categorisation Disaster prevention and preparedness
Тусламжийн төсөл Project and programme contribution
Төслийн дугаар 7F09318
Үндэслэл, суурь мэдээлэл | As the largest land-locked country in the world and being exposed to significant climatic challenges, Mongolia is vulnerable, in varying degrees, to a large number of natural disasters such as earthquakes, floods, landslides, forest fires, as well as incidents impacted by extremely harsh winters. The increasing urban environments of Ulaanbaatar, where around 50 % of the country’s total population of 3 mio. inhabitants live, as well as the cities of Darkhan and Erdenet are especially prone to earthquakes of moderate to very high intensity. |
Зорилтууд | NEMA’s national response capacities are strengthened and its search and rescue operations extended to urban areas according to international standards. It aims to efficiently rescuing victims trapped under rubbles of collapsed structures, as demonstrable on the adapted organizational setup, training infrastructure, equipment as well as theoretical and practical know-how. |
Зорилтот бүлэг |
Direct beneficiaries: (Urban) Search and Rescue experts and the management of NEMA Indirect beneficiaries: All urban dwellers of Mongolia, particularly those in the capital Ulaanbaatar |
Дунд хугацааны үр дүн |
Outcome 1 NEMA’s USAR units own, use and maintain appropriate training facilities consisting of a Modular Training Ground (MTG), including various training stations, that enable them to practice USAR techniques according to international standards.
NEMA’s USAR units’ response capacities have been improved through introduction of systematic training of USAR techniques according to international standards, by using the partly newly purchased rescue tools, as well as through adaptations of the organizational setup and logistical infrastructure. |
Үр дүн |
Хүрэх үр дүн: 1.1: The planning of the Modular Training Ground (MTG) has been consolidated between NEMA, SDC experts and the mandated contractor, based on the results of the pilot phase. 1.2: The construction of the Modular Training Ground (MTG) has been realized by the mandated contractor on the determined premises of NEMA’s Special Rescue Unit (SRU) near Ulaanbaatar, based on the finalized planning and with supervision of NEMA and SDC experts. 1.3: NEMA has acquired know-how on the use and maintenance of the new MTG. 2.1: NEMA’s infrastructure to store, maintain and repair the rescue tools, including the newly purchased ones, are prepared and conditioned to be used for trainings. 2.2: NEMA has carried out practical USAR trainings on site, by using the SDC donated and new, locally purchased rescue tools. 2.3: NEMA has initiated the necessary adaptions to systematically manage its USAR units during the preparedness, mobilization, deployment and demobilization phases on national base. Өмнөх үе шатны гол үр дүн: During the project “pilot phase” (1.7.2017-31.12.2018) the capacity building process was initiated and developed with the following achievements: |
Удирдлага / Хариуцах байгууллага |
ШХА |
Кредит |
Humanitarian aid |
Төслийн хамтрагч |
гэрээт хамтрагч Foreign state institution |
Бусад төсөлтэй уялдсан байдал | Synergies, coordination and – as far as possible – trilateral cooperation is sought with the USAR entities of the newly established Chinese Ministry of Emergency Management (MEM). |
Төсөв | Одоо хэрэгжиж буй үе шат Швейцарийн төсөв шв.франк 210’000 Өнөөг хүртэл олгосон Швейцарийн санхүүжилт шв.франк 192’017 Total Project Since First Phase Швейцарийн төсөв шв.франк 272’448 Нийт төсөв (түнш хамтрагчийн хувийг оролцуулсан байдлаар) шв.франк 810’048 |
Төслийн үр шатууд |
Phase
3
20.01.2023
- 31.12.2024
(Одоо хэрэгжиж буй үе шат)
Phase 2 01.01.2019 - 31.12.2019 (Completed) Phase 1 01.07.2017 - 31.12.2018 (Completed) |