Operational capabilities of the Anticorruption General Direction (AGD)

Projekt abgeschlossen

The project was aimed to strenghten the operational capabilites of the Anticorruption General Direction (AGD) of the Ministry of Administration and Interior (MAI) of the Government of Romania by modern equipment and training of investigative teams. The project was part of the thematic fund security in Romania. Further information about this fund can be found among the additional information on the very bottom of this page.

 

Land/Region Thema Periode Budget
Rumänien
Öffentliche Sicherheit erhöhen
Kampf gegen Korruption und organisierte Kriminalität
01.03.2012 - 31.08.2013
CHF  273’500
Zielgruppen

Staff of Ministry of Administration and Interior

Aktivitäten The objectives have been achieved by strengthening the technical capacity of investigative teams to perform efficient undercover investigations (see result 1), by securing the IT and Communication systems that need upgrading to ensure that field operations can take place safely (see result 2) and by equipping the crime analysis teams with minimum statistical package to perform statistical analyses included in their general studies and discover crime patterns and series (see result 3).
Resultate

Erreichte Resultate:  

  • Increase of cases transferred by AGD to prosecution by 17%
  • The needed surveillance equipment supplied, installed and effectively used
  • The needed IT&C equipment supplied, installed and effectively used
  • Ensuring the technical support for carrying out diagnosis studies on corruption aspects

 

 


Verantwortliche Direktion/Bundesamt DEZA
Kreditbereich Schweizer Beitrag an die erweiterte EU
Projektpartner Vertragspartner
Privatsektor


Budget Laufende Phase Schweizer Beitrag CHF    273’500 Bereits ausgegebenes Schweizer Budget CHF    0
Projektphasen Phase 22 01.10.2017 - 31.08.2019   (Completed) Phase 21 01.03.2016 - 30.09.2018   (Completed) Phase 20 01.03.2016 - 30.09.2019   (Completed) Phase 19 02.05.2016 - 28.02.2019   (Completed) Phase 18 01.09.2014 - 30.06.2017   (Completed) Phase 17 14.11.2014 - 31.08.2018   (Completed) Phase 16 01.02.2014 - 31.07.2015   (Completed) Phase 15 01.09.2014 - 28.02.2019   (Completed) Phase 14 01.03.2013 - 30.06.2018   (Completed) Phase 13 01.03.2013 - 30.11.2015   (Completed) Phase 12 01.11.2012 - 30.06.2018   (Completed) Phase 11 01.04.2012 - 31.03.2013   (Completed) Phase 10 01.04.2012 - 30.06.2017   (Completed) Phase 9 01.04.2012 - 15.06.2014   (Completed) Phase 8 01.03.2012 - 31.03.2018   (Completed)

Phase 7 01.03.2012 - 31.08.2013   (Completed)

Phase 6 01.03.2012 - 15.11.2014   (Completed) Phase 5 01.03.2012 - 30.06.2018   (Completed) Phase 4 01.03.2012 - 30.09.2019   (Completed) Phase 3 01.03.2012 - 30.07.2015   (Completed) Phase 2 01.01.2012 - 31.12.2017   (Completed)