Treatment Plant for Domestic Septage and Industrial Waste in Vati, Limassol
01.07.2012
- 13.06.2017
The septage collected by tankers from overflowing absorption pits in some areas Limassol, was disposed in lagoons in Vati area, causing pollution of the water of the Polemidia Dam. The project is expected to close the existing septage reception area which negatively affected the quality of the water dam and the termination of the infiltration of untreated waste to the dam, and construct of a new treatment plant for the domestic septage, industrial waste surplus activated sludge and leachate from the rehabilitation of the uncontrolled landfill.
Projet terminé
Modernization of the Technical Vocational Training of the Cyprus Productivity Centre (CPC)
01.09.2010
- 13.06.2017
The project aims at upgrading the Technical Vocational Training system in Cyprus. It supports the development of modern training packages, the development and installation of training facilities in renewable energy and energy conservation, and two Virtual Reality and Simulation Labo-ratories.
Projet terminé
Un centre pour promouvoir les échanges culturels sur l’île de Chypre
01.10.2008
- 30.04.2012
Ce projet a permis d’acheter un vieux bâtiment abandonné dans la zone tampon sur Chypre, de le rénover de fond en comble et de le transformer en un centre culturel et de rencontre. Le centre a ouvert ses portes début mai 2011 et favorise depuis lors le dialogue entre les deux groupes de population. Il apporte ainsi une contribution essentielle à la réconciliation et à la construction de la paix sur l’île de Chypre.
Pays/région | Thème | Période | Budget |
---|---|---|---|
Chypre |
Non Affecté / Non Specifié
Secteur non spécifié
Renforcer la société civile
Organisations non gouvernementales
|
01.10.2008 - 30.04.2012 |
CHF 153’150 |
Objet 1 3 de 3
- 1