Note: the texts under all the headings, with the exception of 'Results achieved', describe the situation before the start of the project.
Flood protection with mobile dams
Upper Tisza River Region is frequently and heavily flooded and has sudden torrents and rainfalls. In a pilot project, the National Directorate General of Disaster Management will purchase and test a mobile dike system that can serve as a rapid response, cost efficient and environmental friendly device. As this system is under certain conditions faster available than conventional flood protection with sandbags, precious time can be gained to protect the inhabitants, property and goods.
Pays/région | Thème | Période | Budget |
---|---|---|---|
Hongrie |
Accroître la sécurité publique
Prévention des catastrophes naturelles et des situations d‘urgence
|
01.10.2012
- 31.12.2016 |
CHF 3’007’097
|
- Mobile dams with a total length of 12.5 km are available at two locations
- 1500 people were trained in the use of mobile dams filled with water
- Can also be used with poor transport infrastructure, as it is easy to transport
- The environmentally friendly system serves as an effective alternative to sandbags - thanks to time savings improved protection of the population in north-eastern Hungary with about 180'000 inhabitants
- National State Institute North
-
Secteur selon catégorisation du Comité d'aide au développement de l'OCDE Non Affecté / Non Specifié
Sous-Secteur selon catégorisation du Comité d'aide au développement de l'OCDE Secteur non spécifié
Type d'aide Contribution à l'élargissement
Numéro de projet 7F08205
Contexte |
The Upper Tisza Region is regularly hit by floods. Flood prevention measures are complemented by natural disasters response actions to contain floodwaters temporarily within a river's embankment and/or providing temporary protection for objects in floodplains. Conventionally sandbags are used, that are kept in storage rooms of municipalities potentially affected by flooding or at the disaster management units. Sandbags are cheap to purchase, however, it takes a lot of time and manpower to fill the sandbags and after usage they have to be disposed of. |
Objectifs |
The goal is to reduce the vulnerability of North-East Hungary in case of extreme weather conditions. For this purpose, new rapid flood response actions reduce the time necessary to protect inhabitants and property as well as material goods. |
Groupes cibles |
180’000 inhabitants in Northern Hungary, especially along the Upper Tisza River Region and its catchment area in the north Great Plains |
Activités |
The Executing Agency will purchase, install and use a mobile dam system. This purchase of equipment will be accompanied by trainings for the local civil defense units and the staff of the regional disaster management directorates. The project is conceived as a pilot – if the system proves to be successful, additional purchase of mobile dikes is planned. |
Résultats |
Résultats obtenus: |
Direction/office fédéral responsable |
DDC |
Crédit |
Contribution suisse à l'UE élargie |
Partenaire de projet |
Partenaire contractuel Institution étatique étrangère |
Budget | Phase en cours Budget de la Suisse CHF 3’007’097 Budget suisse déjà attribué CHF 2’913’381 |
Phases du projet |
Phase 1 01.10.2012 - 31.12.2016 (Completed) |