Tajikistan Water Supply and Sanitation Project
Through the support of the project 30‘000 women and men will have sustained access to safe drinking water and sanitation facilities in three rural districts of Tajikistan thereby contributing to their better health and wellbeing. The project further supports the development of local and national authorities’ capacities and strengthen the policy frameworks in order to enable a more effective, inclusive and sustainable delivery of safe drinking water and sanitation services to the population.
Región/País | Tema | Período | Presupuesto |
---|---|---|---|
Tayikistán |
Salud Agua
Fortalecimiento del sistema sanitario
Saneamiento de agua Servicios médicos Abastecimiento de agua Enfermedad infecciosa Política del sector del agua |
01.07.2018
- 30.06.2022 |
CHF 3’100’000
|
One new water system constructed (for 5’000 people) and seven existing maintained;
One faecal sludge management system including Faecal Sludge Treatment Plant and pit desludging service established for 1’500 households (at least 10’000 people, 50% women) and 3 hospitals;
One sustainable decentralized wastewater treatment facility for 3 hospitals constructed;
Market-based mechanism in place to source, promote and sell the range of sanitation products;
200 improved private pit latrines procured and installed by the population in Rudaki district;
At least 7’000 children in seven schools and 100 medical staff in 7 health centres trained for better hygiene and sanitation practices;
The staff of 3 districts authorities completed capacity development training courses;
Operation of 7 water supply systems meets national & international service performance criteria;
Approval of new edition of Law on Drinking water, at least three policy recommendations on taxation policy and fully recoverable tariff facilitated;
- Revised technical norms and standards for water and sanitation systems endorsed and implemented in rural areas.
More than 48’000 (50.1% women) people got access to safe drinking water in Rudaki, Muminobod and Kulob districts;
14 water supply systems constructed and operated by community-based water management structures;
Access to sanitation improved in 8 schools (6’500 schoolchildren and 536 school staff) and 6 health facilities (365 medical staff and at least 1’000 patients per month);
3 Water Trust Funds (WTF) established in Rudaki, Muminabad and Kulob districts;
Laws and policy documents on ownership of water supply systems, taxation and water tariffs enacted;
- National State Institute North
- OXFAM GB
- Sector privado extranjero Norte
-
Sector según clasificación del comité de ayuda al desarrollo de la OCDE SALUD
ABASTECIMIENTO DE AGUA Y SANEAMIENTO
SALUD
ABASTECIMIENTO DE AGUA Y SANEAMIENTO
SALUD
ABASTECIMIENTO DE AGUA Y SANEAMIENTO
Sub-Sector según clasificación del comité de ayuda al desarrollo de la OCDE Política sanitaria y gestión administrativa
Basic sanitation
Servicios médicos
Basic drinking water supply
Control enfermedades infecciosas
Política de recursos hídricos y gestión administrativa
Temas transversales Derechos humanos
Tipo de ayuda Mandato con fondos fiduciarios
Mandato sin fondos fiduciarios
Número de proyecto 7F06431
Contexto |
Tajikistan is a water-rich country; however access of people to safe drinking water and sanitation in rural areas is very limited. Only 43.4% of rural population have access to safe drinking water and 0.2% - to sewage system and good sanitary conditions. The lack of access to sanitation infrastructure and poor hygiene practices cause spread water-borne diseases. Deteriorated and poorly maintained infrastructure, limited financial investments, insufficient technical and managerial capacities, weak institutions and inadequate policies are the main factors leading to insufficient service delivery in the safe drinking water and sanitation sub-sector. |
Objetivos | Healthier population as a result of sustained access to safe drinking water and sanitation services and improved hygiene behaviour. |
Grupos destinarios | The target group will consist of 30’000 people benefiting from sustainable water governance and effective service delivery. From these 5’000 people will get new access to safe drinking water and 10’000 people to improved sanitation and hygiene practices. Government structures (district hukumats, jamoats, SUE KMK, Tojik Ob Dekhot) and local CBOs (Mahalla Committees, WUAs and Community Advisory Boards) will be strengthened by capacity development campaigns. |
Efectos a medio plazo |
Outcome 1: People benefit from innovative and sustainable water and sanitation services and improved hygiene practices Outcome 2: Water governance bodies effectively manage drinking water supply and sanitation systems Outcome 3: Conducive policy environment at national level allows for effective management of drinking water and sanitation systems in rural areas |
Resultados |
Resultados previstos: Resultados de las fases anteriores: Analysis of the national state of de-monopolization and of the private sector involvement in the sphere of drinking water supply and sanitation and review of sanitation policy and practice in Tajikistan conducted. |
Dirección / Officina Federal responsable |
COSUDE |
Crédito |
Cooperación con Europa del Este |
Contrapartes del proyecto |
Contraparte del contrato ONG internacional o extranjera Sector privado Institución estatal extrangera Otras contrapartes Oxfam GB International |
Coordinación con otros proyectos y actores | The project will revitalize effective coordination and synergies with a wide range of stakeholders including government structures, local authorities, international organizations, UN agencies, INGOs, civil society and the private sector. The cooperation will be strengthened through such coordination and decision-making platforms as TajWSS network, NPD and IMCG. Specific focus will be on strengthening collaboration with other Swiss-funded WASH projects through peer exchange, sharing best practices as well as knowledge transfer. The cooperation will be further enhanced through facilitation of policy dialogues on national as well as local level. |
Presupuesto | Fase en curso Presupuesto suizo CHF 3’100’000 Presupuesto actual suizo ya emitido CHF 2’996’500 |
Fases del proyecto |
Fase 3 01.07.2018 - 30.06.2022 (Completed) Fase 2 01.11.2013 - 30.06.2018 (Completed) |